Challenge

A Dubai-based energy developer needed 85 metric tons of high-grade copper cathode for a solar farm grid connection but struggled with inconsistent supply from African sources. Previous shipments lacked LBMA-aligned documentation, traceability, or moisture control, risking project timelines and ESG compliance.

Solution

AFRICA GOLD sourced material from a licensed South African producer, arranged third-party assaying (Cu 99.99%), sealed and moisture-controlled packaging, and provided full chain-of-custody records aligned with UAE import standards. The shipment cleared Jebel Ali Port in 11 days on time for the project’s installation phase.