Copper for Global Renewable Energy Infrastructure

Challenge

A Dubai-based renewable energy firm needed 200 metric tons of high-conductivity copper cathode for a 300MW solar farm but faced delays due to inconsistent grades and missing ESG documentation from African suppliers. Their financiers required IRMA-aligned sourcing proof and full chain-of-custody.

Solution

AFRICA GOLD sourced material from a DMRE-licensed mine in Limpopo, arranged SGS conductivity testing (≥100% IACS), secured IRMA-aligned ethical declaration, and provided digital chain-of-custody logs. The shipment cleared Jebel Ali Port in 9 days and was accepted by the project’s ESG auditor without revision.

Let’s Source African Minerals Together

0

Subtotal